2022-2025
$6.1 million project
San Diego, CA
Sentinel Built served as the project manager for HMS Construction (traffic signal & street lighting subcontractor). The Border to Bayshore Bikeway - is an approximately a 6.7 mile route that will provide safe biking connections within and between Imperial Beach, San Ysidro, and the World's busie
2022-2025
$6.1 million project
San Diego, CA
Sentinel Built served as the project manager for HMS Construction (traffic signal & street lighting subcontractor). The Border to Bayshore Bikeway - is an approximately a 6.7 mile route that will provide safe biking connections within and between Imperial Beach, San Ysidro, and the World's busiest land border crossing and the San Ysidro Port of Entry. It also will make it safer and easier for people to bike from Imperial Beach to San Ysidro.
2022-2025
$5.5 million project
San Diego, CA
Sentinel Built served as the project manager for HMS Construction (railroad systems & traffic signal subcontractor). The Bayshore Bikeway - Barrio Logan segment "32nd street to Park Blvd"; this segment of the bikeway stretches 2.5 miles along Harbor Dr between Park Blvd and 32nd Street and will connect two existing segments of the Bikeway.
2022-2024
$6.6 million project
San Diego, CA
Sentinel Built served as the project manager for HMS Construction (railroad systems subcontractor). The IMT Double Track project for the Green Line provides greater operational flexibility, better connections, and allows for tighter Green Line headways during special events such as Comic Con.
2021-2022
$4.1 million project
San Diego, CA
Sentinel Built served as the project manager for Herzog Technologies (prime). Beech Street Double crossover helped MTS upgrade the rail infrastructure, including switches, signaling, and fiber networks along the Green Line in downtown San Diego. The improvements increased the operating flexibil
2021-2022
$4.1 million project
San Diego, CA
Sentinel Built served as the project manager for Herzog Technologies (prime). Beech Street Double crossover helped MTS upgrade the rail infrastructure, including switches, signaling, and fiber networks along the Green Line in downtown San Diego. The improvements increased the operating flexibility, reduced the service disruptions, and increased the work windows for maintenance.
2020-2021
$3 million project
San Diego, CA.
Sentinel Built provided project management services for Herzog Technologies (HTI). MCTC was the prime contractor for the project. Sentinel Built and HTI oversaw the railroad systems improvements for this project.
2021
$2.2 million project
Whitefish, MT
Sentinel Built provided estimating services for GC Legacy Construction. Project consisted of an 8-unit ground condo development.
Sentinel Built Inc.
1220 Rosecrans #151 San Diego, CA 92106
CA License B #1087855
WBE #21000661
CA SB Micro & SB-PW, Cert # 2029530
City of San Diego ELBE, Cert #17SB1891
CA Real Estate License #02022452
Copyright © 2024 Sentinel Built - All Rights Reserved.
Powered by GoDaddy
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.